Container tracking for fresh produce importers

How to track a reefer container end-to-end

What to watch at each stage of a refrigerated container's journey, which events actually change what you do, and why the temperature log matters most.

6 min read

By Edouard Brière · Last updated

A reefer container produces more data than any other box on the vessel, and most importers use almost none of it. This guide goes through the journey stage by stage: what is knowable at each point, what is worth acting on, and what to collect before it becomes hard to get.

Before departure

Confirm the setpoint and ventilation before the container is loaded. This is the only stage where they can still be changed, and a mistake cannot be put right at destination. Temperature, fresh air exchange rate, and controlled atmosphere if you are paying for it — all commercial decisions made before the doors close.

Get the container number. You do not need the transport document to start tracking; the container or bill of lading number is enough. Registering it early means the tracking history starts from the beginning rather than from whenever the paperwork caught up.

Departure

The event to wait for is loaded on vessel, followed by vessel departed. Until the first of these arrives, you have a booking and not yet a shipment. The gap between them is where a rollover shows up, as a missing event and never as a notification.

A vessel that sails without a load event for your container is the earliest reliable signal that something has gone wrong. Nobody will call you about it.

At sea

This is the stage where importers watch most closely and there is least to see, which is a poor combination.

Carriers publish milestones at port calls. Mid-ocean, days or weeks can pass with nothing new, and that is normal. It is not a failure. What does keep updating is the vessel’s AIS position, which comes from a separate feed.

So at sea, the question to ask is whether the silence is normal. Two clocks answer it:

  • Carrier published — when the line last reported a milestone. Quiet for weeks mid-voyage is expected.
  • Vessel position moved — when the ship was last confirmed at a real AIS fix. If this is recent, the voyage is fine.

A quiet carrier plus a moving vessel is a healthy shipment. A quiet carrier plus a stationary vessel is worth a question. Good alerting makes that distinction instead of firing on carrier silence alone. Silence mid-ocean is normal, and an alert that raises a false alarm on every voyage will be switched off by the second season.

If your box carries the hardware, this is also the stage where reefer monitoring is worth having. It reports the unit’s air temperatures during the voyage rather than at the end of it, so you can find a problem while you can still do something about it, instead of reading about it afterwards.

Transshipment

If your routing has one, this is the highest-risk point in the journey — see why tracking positions are often wrong for why the map stops helping here.

What you want is a discharge at the hub followed within hours by a load onto the onward vessel. A discharge with no matching load, days later, means the connection was missed and the box is waiting for the next sailing. On a weekly service that is seven days of shelf life.

Arrival and discharge

Discharge from the vessel is the event that matters most in the whole journey, and it is the one most importers watch least. It starts your free time, and for a reefer that clock is short — often 2–4 days against 5–7 for dry.

The clock starts at discharge, not at the ETA. A vessel arriving two days early shortens your window by two days, and an ETA-based plan will not notice.

Act on this event, not the forecast: confirm the haulier, confirm the customs entry is filed, confirm the cold store has a bay.

Gate-out and the road leg

Gate-out ends demurrage and starts detention. The container is now yours to hold, and detention is charged at reefer rates.

The reefer needs power on the road — a genset, or a short enough run that thermal mass covers it. A container waiting for an unloading bay with no power is a cold-chain risk, not just a scheduling one.

Strip and empty return

Detention runs until the empty is returned to the depot, not until you unload it. A stripped container sitting in your yard is still on hire. This is the step everyone treats as somebody else’s job, and it is where the last avoidable charges accumulate.

Book the empty return slot early — depots run out of them.

Trackberry counts detention days from gate-out until the carrier reports the empty return, so the days a stripped container spends in your yard are still counted.

Before you return it: pull the temperature log

Every reefer records its actual temperature through the voyage. Download that log as a matter of routine, on arrival, every time.

It is the only document that distinguishes a pre-shipment quality problem from a cold-chain failure. If fruit arrives soft, the log is what tells you whether it was packed warm, whether the unit held setpoint, and whether there was a gap. Without it, a quality claim is one party’s word against another’s.

Once the container has gone back, getting the log is slow, and sometimes impossible. Pulling a log you never need costs nothing.

If something has gone wrong, the log is one part of a claim file, and that file has a deadline. How importers document and win a reefer cargo claim sets out what else goes in it and how long you have.

The short version

Stage Watch for Why
Before loading Setpoint, ventilation, CA Last chance to change them
Departure Load event, then sailed No load event = rolled
At sea Carrier quiet + AIS moving Distinguishes quiet from broken
Transshipment Discharge, then load A gap is a missed connection
Discharge The event itself Starts free time
Gate-out The event Demurrage ends, detention starts
Empty return The event Detention ends here, not at strip
On arrival Temperature log Only defence in a quality claim

Trackberry watches each of these stages on your own reefers and flags the events that change what you do. See how it works for produce importers, or book a 20-minute chat.

FAQ

What is the single most important event to watch?

Discharge from the vessel. It starts your free time, and almost every avoidable demurrage charge traces back to someone learning about it after the fact rather than as it happened.

Why does my carrier report nothing for weeks mid-voyage?

Because carriers publish milestones at port calls, and mid-ocean there are none. Check the vessel’s AIS position instead: recent movement means the voyage is fine and the carrier has nothing to report yet.

When should I download the temperature log?

On arrival, every time, whether or not there is a problem. Once the container is returned the data gets harder and slower to obtain, and by the time a quality dispute exists it is usually too late to go looking.

Does detention stop when I unload the container?

No. It stops when the empty is returned to the depot. A stripped container in your yard is still on hire, at reefer rates.

How much free time does a reefer get?

Typically 2–4 days at destination against 5–7 for dry, at a higher daily rate once it runs out. It varies by line and contract, so check yours rather than assuming a standard number.

Tags: tracking reefer cold-chain